Interlude
13th October 2010 (with amendments up to 18th October)
Over the last few weeks, progress has been maintained on the collection, though of course never as fast as we would wish. Over at Scunthorpe, "Beverley"'s silencer has been removed for replacement and the exhaust tail pipe detached in order that various corrosion holes can be filled prior to refitting. Work has progressed on the front end of D2128, preparing for the new engine mounts, the fabrications of which have now been completed. Here is Andrew cleaning up the areas around the front frame stretcher...

Consideration is being given to fitting the loco with a spring-apply/pressure release parking brake rather than the long hand-brake linkage (seen above) but no final decision has been made yet.
There has not been much progress on "James" at the DVLR (York) although at least the fuel pump is back on site. Unfortunately at our last visit, the "dull with some showers" forecast translated to "continuous rain, sometimes heavy" - not conducive to welding brackets or fixing vac pipes.
Drewry "72229" has had new batteries fitted and the engine run up for a few minutes to check all well. It has been confirmed that the loco will depart Elsecar for the Derwent Valley at York, to assist on the DVLR's Santa trains, for which the overhauled vac exhauster will be fitted and minor air issues attended to.
Back at Rowsley, 14 901 is being prepared for its role at the HST "Shunter Hunter" event (October 23rd and 24th) though as yet no timetables are available. Although performing faultlessly up to late September, on Monday 27th, after shunting an impressive train together destined for Darley during the morning, after lunch it had flat batteries and the train had to be taken by "Charlie". The following day a defective alternator was diagnosed and duly taken to Leeds for identification and replacement. It transpires to be a now-uncommon pattern originally fitted (as we suspected) to a DAF truck. The replacement was fitted on Monday the 4th October and the loco is again available for traffic. Briddon-towers' front hall is currently hosting several large sheets of pegboard for the cab lining, and the 'similar-from-a-distance' casing top vents have arrived from the fabricators and await painting -

The air intake fabrication too, has been completed but is unlikely to be fitted before the October 23/4 event, although Andrew plans to open the fuel pump from the 1300 rpm to 1600rpm max to give the loco more power with the 3 or 4 coach trains anticipated. This reflects the reduction of vibration following the refitting of the torsional coupling, though we will not be going to full 1800rpm yet.
LATE NEWS! According to the PLEG website, 14901 is booked to operate one train each day for the HST Gala at Peak Rail, to whit -
| SATURDAY | SUNDAY | |
| Rowsley depart | 10.45 | 14.05 |
| Matlock arrive | 11.15 | 14.35 |
| Matlock depart | 11.30 | 14.50 |
| Rowsley arrive | 12.05 | 15.25 |
(This table, extracted from the PLEG site on Monday afternoon, differs from that downloaded on Sunday evening, so may change again!)